Home > Industry/Domain > Construction > Heavy & civil

Heavy & civil

Contributors in Heavy & civil

Heavy & civil

age plan

Construction; Heavy & civil

Padamana period structures or structural elements must function without the necessary repairs.

nominal maximum grain size

Construction; Heavy & civil

Indicated by the maximum sieve size that can hold at least 10% aggregate.

size

Construction; Heavy & civil

Size / diameter of steel wire.

tape pull test with the width method

Construction; Heavy & civil

Tensile test in which one whole side of the axis of the specimen width (200 mm) is clamped and panjangnyaadalah 100 mm dimensions.

pull test

Construction; Heavy & civil

A test in which the textile material stretched in one direction to determine the characteristics of gayadan elongation, breaking force, or the breaking elongation.

grab test

Construction; Heavy & civil

Tensile strength test is performed only on the partial width of the specimen using a clamp.

cementite

Construction; Heavy & civil

Chemical compound with the formula Fe3C or Fe2C: Fe and the crystal structure ortohombik. This material is hard, brittle, normally classified as a ceramic in its pure form.

Featured blossaries

Tanjung's Sample Blossary

Category: Entertainment   1 6 Terms

Tomb Raider (2013)

Category: Entertainment   1 5 Terms