Home > Industry/Domain > Construction > Heavy & civil

Heavy & civil

Contributors in Heavy & civil

Heavy & civil

eutectoid point

Construction; Heavy & civil

Liquid phase boundary points are directly met with two alloy solid phase at a temperature of 721 oc.

cycle voltage

Construction; Heavy & civil

One cycle of voltage is determined by calculating the voltage cycle.

actual material properties

Construction; Heavy & civil

Material properties determined from representative samples for testing in accordance denganpersyaratan fire-related product standards.

expansion of broadcasting

Construction; Heavy & civil

Material mounted between two areas of concrete floor to the vehicle or on a rigid pavement and may also be a meeting between the construction of approach roads as media traffic will pass through the ...

shotcrete

Construction; Heavy & civil

PC mortar and sand mixture using a syringe fitted sehinggaplasteran reaches a certain thickness.

stitch

Construction; Heavy & civil

Repetition unit formed in the manufacture of sewing thread sewing hems on the geotextile (or its equivalent No.751a usstandard).

flow and volume sensor

Construction; Heavy & civil

Part of the water meter (such as disc, piston, wheel, turbine element or electromagnetic coil), yangmengubah measured water flow into a measuring scale or volume of water through the water meter.

Featured blossaries

Serbian Customs

Category: Culture   2 5 Terms

Cactuses

Category: Geography   2 10 Terms